National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Preparation of Construction and OSH
Vaculík, Jakub ; Šopík, Josef (referee) ; Nováková, Jana (advisor)
This study investigates the management of a construction project from the building contractor’s point of view. The main aim is to describe the construction readiness process, including the technical drawings, risk assessment and OSH solutions. The literature review provides an overview of the key terminology used in the management of a construction site, contractor readiness and OSH. The practical section of this study then describes order preparation, construction readiness, risk assessment, OSH solutions and fire risk assessment for the I/43 Milonice intersection turn lane.
Family house Rb -3
Růžička, Jiří ; Sibilla, Luboš (referee) ; Vlček, Milan (advisor)
The project is design a house with a small establishment. The project includes the layout and the design of the house. The house has three floors with an attic and one basement floor. It is designed as a stand-alone. The first floor of the establishment of the background and the main entrance to the house. The rest of the house is designed for family living. This part is a utility room, basement and garage in the basement. Living room with household equipment is then in the upper part of the house. The house is run by two separate entrances with wheelchair access to the premises and the entrance to the garage in the basement. The house is designed as a brick building of brick masonry Porotherm in modular size 250 (125) mm with ceramic ceilings MIAKO a cylinder. Roofed by a gabled roof. The house is located on a private plot of 1200 m2 with built up area of 120 m2. The land is gently sloping.
Preparation of Construction and OSH
Vaculík, Jakub ; Šopík, Josef (referee) ; Nováková, Jana (advisor)
This study investigates the management of a construction project from the building contractor’s point of view. The main aim is to describe the construction readiness process, including the technical drawings, risk assessment and OSH solutions. The literature review provides an overview of the key terminology used in the management of a construction site, contractor readiness and OSH. The practical section of this study then describes order preparation, construction readiness, risk assessment, OSH solutions and fire risk assessment for the I/43 Milonice intersection turn lane.
Family house Rb -3
Růžička, Jiří ; Sibilla, Luboš (referee) ; Vlček, Milan (advisor)
The project is design a house with a small establishment. The project includes the layout and the design of the house. The house has three floors with an attic and one basement floor. It is designed as a stand-alone. The first floor of the establishment of the background and the main entrance to the house. The rest of the house is designed for family living. This part is a utility room, basement and garage in the basement. Living room with household equipment is then in the upper part of the house. The house is run by two separate entrances with wheelchair access to the premises and the entrance to the garage in the basement. The house is designed as a brick building of brick masonry Porotherm in modular size 250 (125) mm with ceramic ceilings MIAKO a cylinder. Roofed by a gabled roof. The house is located on a private plot of 1200 m2 with built up area of 120 m2. The land is gently sloping.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.